• Skip to primary navigation
  • Skip to main content

Jeffrey J Davis Photography

Fine Art Photography From Seabrook Island and Beyond

  • Fine Art Photography
    • Life On Seabrook
    • Above and Beyond With the Flying Camera
    • Sun Meets Horizon
    • Mother Ocean
    • As Far As The Eye Can See
    • Where The Wild Things Are
    • Man Made
    • Search Photos By Tag
    • Full Collection, Chronological By Location
      • 2022
        • 2022 Seabrook Island
        • 202204 Destin, Florida
        • 202205 Letchworth Falls
        • 202205 Spanish Wells , Bahamas
        • 202206 Wesley Hill Nature Preserve
        • 202208 Buffalo Silo City
        • 202211 Frankfurt
      • 2021
        • 202103 Florida Keys
        • 202106 Estero Island
        • 202112 Turks & Caicos
        • 2021 Seabrook Island
      • 2020
        • 202001 Seabrook Island
        • 202001 Okaloosa Island
        • 202003 Oahu
        • 202007 Seabrook Island
        • 202011 Seabrook Island
        • 2020 Destin
      • 2019
        • 201904 Turks and Caicos
        • 201905 Seabrook Island
        • 201906 Estero Island, Florida
        • 201906 Exuma
        • 201908 Colorado
        • 201910 Avon Lake Backwash
        • 201912 Turks and Caicos
        • 2019 Destin
      • 2018
        • 201812 Breckenridge
        • 201811 Birmingham / Phoenix
        • 201809 Napa Valley
        • 201809 Lake Tahoe
        • 201807 Seabrook Island
        • 201806 Estero Island, Florida
        • 201805 Elko Expo
        • 201805 BVI’s Split Second
        • 201804 Dubai and Hummingbirds
      • 2017
        • 201712 Breckenridge
        • 201706 Palm Island
      • 2016
        • 201611 Austin Lost Pines Seabrook Island
        • 201611 Ibis Hotel
        • 201607 Estero Island , Turks and Caicos
        • 201602 Phoenix / Utah
      • 2015
        • 201511 Keys Destin
        • 201509 Napa
        • 201507 Montana
        • 201505 Yellowstone / Mustique
      • 2014
        • 201412 Houston Zoo / Destin
        • 201403 BVI’s Sailing Trip
      • 2013
        • 201311 Napa Valley
        • 201305 Abaco
        • 201304 Seabrook Island
      • 2012
        • 201209 Biltmore
        • 201207 Seabrook Island
        • 201206 Estero Island
      • Print Surface / Format Options
  • Portrait Photography
  • Real Estate Photography
  • Cart
  • About
    • About Jeffrey J Davis
    • Experience
      • Creating New Business Models
      • Growth Through Global Expansion
      • Innovative New Products
      • New Strategies For Sustainable Competitive Advantage
      • What Others Say About Jeff
      • Jeffrey J Davis’s Resume
    • Blog
    • Contact
  • Shopping Cart
  • Shopping Cart
  • Shopping Cart
You are here: Home / Experience / New Strategies For Sustainable Competitive Advantage

New Strategies For Sustainable Competitive Advantage

GE ColorXpress

Situation

GE Plastics had received numerous customer survey inputs that their color matching capability was a key customer dis-satisfaction point.  (Color matching in plastics is analogous to getting paint matched at a hardware store, but significantly more involved due to processes involved.)  Customers complained that color matches took too long (4 – 6 weeks), were too complicated (distributed color labs by product resin family which all used different processes), and had a poor success rate (<60% first pass acceptance by customer).Jeff was chartered by his boss, Jeff Immelt (Current GE CEO), to “Fix this problem, once and for all“.

Approach

Jeff quickly realized that what initially felt like a quality problem clean-up assignment had the potential to be turned into a game-changing competitive strategy.  Jeff mapped and benchmarked the existing processes and then built a small team to drive a clean-sheet redesign.  He drove this redesign with a Design for Six Sigma approach off a a set of design goals which would deliver true competitive advantage for GE Plastics:  48 hour turnaround time with 99% plus first pass customer acceptance of customer matches.  Every aspect of the color matching process was redesigned from the bottom up, including technical process equipment, software and especially every aspect of the user touchpoint interaces with the service process.  Color activities were centralized in a greenfield center of excellence facility which soon became known as GE ColorXpress.  The redesign, recruiting and construction process took 18 months and the facility was commissioned in mid 1998.

Results

ColorXpress Color And Texture Chips
ColorXpress Color And Texture Chips

The GE ColorXpress  service advantage was immediately evident and the new process reduced the match cycles from 6 weeks to 48 hours with near perfect acceptance, totally exceeding customers’ expectations. By totally redefining the customer interaction at every point, new levels of customer loyalty were achieved.

  • Jeff’s  team built a Color Innovation center where industrial designers could come to the facility and get colors and visual effects matched in different resin systems while they waited.
  • Additionally the business developed the capability to delivery Premium Service “Micro-Lots” of custom color resin which commanded pricing 20X – 50X that of normal market pricing.
  • Jeff received US Patent 6349300 for the implementation of his idea for “ColorXpress Select” an online color matching and browsing tool which allowed remote customers to virtually browse GE’s extensive library of prematched colors, saving time and cost.
  • Jeff developed a business model whereby ColorXpress Services would actually perform all aspects of global color standards management for Global Accounts such as Compaq and Dell, and turned that service into a revenue stream.

This dramatically improved key process competency facilitated wins of more than $100MM annually of custom color resin business in the following years.   The ColorXpress model has an entire chapter devoted to it in Patricia Seybold’s book “Outside Innovation“.  Although the business is now known as “Sabic Innovative Plastics” the ColorXpress platform remains a key point of the business commercial strategy, more than 10 years later.

Color Innovation Center
Color Innovation Center

AGY Precious Metal Processing

Situation

As part of its manufacturing process, AGY uses large amounts of the precious metals Platinum and Rhodium to make key process components. At any one time, the company may have hundreds of millions of dollars invested in these parts, representing a sigificant capital investment. AGY relied on an outside supplier for 100% of it’s fabrication, with long part fabrication cycles which in some cases exceeeded the life of the part in the process. Reducing the cycle time and the cost of the alloy fabrication represented a key opportunity to free up capital intensity and reduce costs.

Approach

Jeff developed a strategy to bring the competency to fabricate these parts in house. A new greenfield facility was constructed in AGY Aiken. By purchasing the assets on auction from a competitive fiberglass producer who was going out of business, AGY was able to secure the key equipment required for pennies on the dollar, as well as recruit a key team already experienced in these very specialized fabrication techniques. By using LEAN manufacturing techniques, the business was able to reduce the part fabrication cycle by 75%, significantly reducing the total metal required to support the process.

Results

Jeff’s team commissioned the new facility in 2Q09 on schedule and on budget. Total metal required to support the process are expected to be reduced by more than $20MM, and total reduction in fabrication costs should increase EBITDA by over $3MM.

© 2025 · Jeffrey J Davis Photography · Powered by Imagely